Description of the drilling procedure and the various tests done to make sure the appropriate and maximum depth has been reached to get the most oil flowing from a chosen site. Once the oil rig system is set up and in place, the crew starts the drilling operation. Above where the geologists have predicted the oil trap is located, a starter hole is drilled to the surface hole and down to a pre-set depth.
More: continued here