PugetSoundEnergy asked: This time-lapse video shows the assembly of three wind-power turbines within a two-day period in June 2011 at Puget Sound Energy’s Lower Snake River Wind Project-Phase I, located in Garfield County, Washington. From the ground to the tip of a vertical blade, the 2.3-megawatt turbines stand more than 430 feet tall and weigh 340 tons. The boom on …
Read More »